A clear project brief helps your air quality consultant understand the site, identify the right scope and prepare a meaningful quotation. This checklist is for architects, developers, planning consultants and project managers. Send what you have: the information needed will depend on the site and the questions the assessment needs to answer.
1. Identify the site and the proposal
- Site address and postcode: include a location plan and the red-line boundary if available.
- Proposal: describe the current use, the intended use and the scale of the development, such as the number of homes or proposed floor area.
- Drawings: share the latest site layout, floor plans and elevations, including the position of homes, gardens, balconies and ventilation intakes where relevant.
2. Share planning requirements and deadlines
- Planning stage: tell us whether the work is for pre-application advice, a new application, an environmental statement or a condition discharge.
- Council correspondence: include any validation request, planning condition, consultation response or agreed assessment scope.
- Programme: provide your submission or decision deadline, likely construction dates and the contact details for the project team.
3. Describe potential sources and people affected
- Traffic and access: share a transport assessment or traffic data if available. Where detailed modelling is needed, useful information can include road layouts, traffic flows, vehicle mix, speeds and assessment years.
- Combustion plant: identify proposed boilers, generators, combined heat and power plant or other sources. Share the specification, location, flue height, expected operating hours and emissions information if available.
- Nearby uses: identify homes, schools, hospitals, workplaces and other sensitive locations, as well as busy roads, industrial sites or other relevant sources near the proposal.
4. Explain the construction works
Tell us whether the project includes demolition, earthworks, construction or movements that could track mud and dust onto the public highway. A site layout, outline programme, indicative vehicle routes and details of nearby receptors will help establish the scope of a construction dust review. Monitoring and mitigation should be selected for the site and any relevant planning requirements.
5. Flag any special requirements
For London projects, let us know if the authority has requested an Air Quality Neutral assessment, an Air Quality and Dust Management Plan, monitoring or information on non-road mobile machinery. Elsewhere, share any local requirements you already have. An Air Quality Management Area or a nearby road does not, on its own, determine that detailed modelling is required.
What happens next?
Freshbreeze will review the available information and discuss a proportionate scope, the information still needed, the fee and the programme. You do not need every item on this list before getting in touch. For an initial review, see our free air quality screening or explore our air quality assessment services. Email info@freshbreezeeltd.co.uk or call 0121 827 2737.
Useful references: IAQM guidance and, for England, the National Planning Policy Framework, Chapter 17. Planning policy differs across the UK and local requirements should also be checked.
Author: Muhammad Rajput MSc CEnv, Founder and Director of Freshbreeze Environmental Ltd.

[…] Environmental provides air quality assessments for planning applications across the UK. Read our project information checklist, then send us your site details for a quote or call 0121 827 2737, and we will reply within 24 […]